Harlan (Trey) Russell
PTAG 8-12-2013 to Present Keystone - Houston Lateral Pipeline Facilities Owner
Operator Sr. Scheduler Set up
Project WBS, Build Resource and cost load schedule. Maintain and report
Contractor Engineering, Contractor Procurement, and Construction Contractor
input to schedule. Attend weekly update meetings and cost controls meetings.
Deliver Level one and Three schedules to team and work to maintain and
improve delivery dates. Work to
facilitate successful delivery of project deliverables while trying to
maintain cost, procedure and delivery dates. Technip USA, Inc., Houston, TX, 04/11 to 6-06-2013 Principal Onshore Business Unit Planner Exxon Hadrian Project Deep Water Well Development 6/12
- 1/13 Set up
Project WBS, Build Resource and cost load schedule, Maintain and report
engineering project schedules in P6. Maintain engineering physical progress
system (P6). Interact daily with project management to ensure that the
information incorporated in to the project schedule is accurate. Complete
regular updates to the master schedule. Develop weekly/monthly status updates
with both cost and progress analysis with project management. Manage Cost
reports and Curves. Principal Onshore Business Unit Planner Anadarko, Mozambique Liquefied Natural Gas Project 6/11
- 10/11 Set up Project WBS, Build Resource and cost load
schedule, Built and Maintained Pre Feed and EPC Schedules for engineering
project schedules in P6. Maintain engineering physical progress system
(Janus). Interact daily with project management to ensure that the
information incorporated in to the project schedule is accurate. Complete
regular updates to the master schedule. Develop weekly/monthly status updates
with both cost and progress analysis with project management. Project Controls Manager Nexen, Diluent Recovery Unit, Fort McMurray Canada 7/11
- 6/13 Set up
Project WBS, Build Resource and cost load schedule, Maintain supervision over
engineering project schedules in P6. Maintain engineering physical progress
system (Janus). Interact daily with project management to ensure that the
information incorporated in to the project schedule is accurate. Complete
regular updates to the master schedule. Develop weekly/monthly status updates
with both cost and progress analysis with project management. Senior Planner Oxy, Mukhainza, Oman 4/11 - 6/11 Set up
Project WBS, Build Resource and cost load schedule, Maintain engineering
project schedules in P6. Maintain engineering physical progress system
(Janus). Interact daily with project management to ensure that the
information incorporated in to the project schedule is accurate. Complete
regular updates to the master schedule. Develop weekly/monthly status updates
with both cost and progress analysis with project management. Schlumberger SRC, Rosharon, TX, 02/09 to
08/10 Controls Manager Set up
Project WBS, Build, Resource and cost load Subsea tool schedule preparations
and controls planning, as well as cost tracking for the ($100 M )
Pazflor Angola Project. This role included cost tracking and reporting as
well as look ahead reporting for the Construction of two Subsea units.
Created and progressed all department schedules using Primavera
P6 scheduling software. Assisted in controls development to assure a
timely finish at or below cost. Worked with trends that defined project scope
changes and increases to budget and end date. Worked with management to
develop, maintain, and utilize cost controls to improve productivity
efficiency and estimating accuracy. Led efforts to implement a network
Primavera P6 effort to globally track, maintain and control Schlumberger
Subsea projects. Assisted
with Primavera P6 v7 network installation and controls setup to
assist the Planning/Scheduling and Controls with innovative management
services. Bechtel BECON Construction, Houston, TX, 8/07 to
01/09 Controls Manager Set up
Project WBS, Build Resource and cost load schedule, preparations and
construction planning, as well as cost tracking for the Crude Expansion
Project Motiva Port Arthur Texas. This is a 7.2 Billion Dollar Project.
Produced cost tracking and reporting as well as look ahead reporting for the
construction of new units. Created and progressed all department pipeline schedules
using Primavera P6 scheduling software. Assisted in controls development
to assure a timely finish at or below cost. Worked with trends that defined
project scope changes and increases to budget and end date. Worked with
management to develop, maintain, and utilize cost controls to improve
productivity efficiency and estimating accuracy. Universal Ensco, Houston, TX, 03/03 to 08/07 Sr. Planner Scheduler/Cost Controls Set up
Project WBS, Build Resource and cost load Cross Country Pipeline Schedules for
Major Industrial Clients from Engineering design, survey, drafting, permits
and easements as well as bid management, decommissioning and commissioning
procedures, procurement and contractor management of construction of pipeline
and compressor stations. Worked with management to develop, maintain, and
utilize cost controls to improve productivity efficiency and estimating
accuracy. PMP Orientation and Primavera 6.0 Training Primavera
Certification attained. Scheduling and Cost Tracking Petro Chemical, Oil Gas
and Product Pipeline Engineering Projects. Produced templates to estimate and
schedule internal line integrity and new installation/repair work. Created
and progressed all department pipeline schedules using either Microsoft
Project or Primavera P5. Gas Unlimited, Houston, TX, 09/02 to 03/03 Controls Manager Universal Ensco Inc., Houston, TX Set up
Project WBS, Build Resource and cost load schedule, Created Cross Country
Pipeline Schedules for Major Industrial Clients from Engineering design,
survey, drafting, permits and easements as well as bid management,
decommissioning and commissioning procedures, procurement and contractor
management of construction of pipeline and compressor stations. Worked with
management to develop, maintain, and utilize cost controls to improve
productivity efficiency and estimating accuracy. Created Cost Estimates and
templates and implemented Cost Controls and reporting to advise management on
Project status and issues. PDS Technical Services, Houston, TX,
11/01 to 09/02 Sr. Planner Scheduler/Cost Controls Set up
Project WBS, Build Resource and cost load schedule, Implemented Cost Controls
within Estimating and Project Management of the Natural Gas Pipeline division
of Reliant Energy. Prepared, tracked, and reported Microsoft Project
Schedules. Developed and implemented controls in a start up project group at
Reliant Energy Pipeline Services Houston, Texas. Kellogg Brown and Root, Houston, TX,
08/98 to 10/01 Estimator Planner Scheduler/Purchaser Sterling Chemicals, Petro Chemical Facility, Texas
City, TX In
charge of all Capital Projects / Maintenance Work Order estimates given to
KBR while at the Industrial. Set up Project WBS, Build Resource and cost load
schedule, planned, estimated and scheduled all projects both Maintenance, New
Construction and Turnaround. Purchased all materials necessary for completion
of Maintenance, Capital Project and Turnaround jobs. Over 600 Million
Dollars worth of projects planned and scheduled. Average quality of end
estimate finished within 5% to 10% over/ under jobs bid. These usually do to
scope change within execution of project. Brown and Root Industrial Services, Houston, TX,
09/91 to 08/98 Estimator Planner Scheduler/Purchaser Planner
Scheduler/Estimator/Purchaser in charge of setting up Project WBS, Build and
Resource load and cost load schedule, for Maintenance, Turnaround, and
Capital Projects work orders given out by Industrial Client to Brown and
Root. Purchased all materials for job site including mechanical, electrical
and civil materials. Rented all equipment as well for special purpose
installation. Handled returns of defective and overage materials. Provided
materials just in time method of management. Grass Roots Projects to complete
Unit Expansion and Turnaround. Electrician Projects
included Maintenance, Turnaround and Capital Projects of which was into the
Hundreds of Millions of Dollars. Industrial process duties included
troubleshooting, installing and maintaining plant electrical systems.
Installation from prints of electrical devices from alarms to instrumentation
and electric switch gear and motors and pumps. Exposed to complete
construction process all crafts start to finish. Don Love Ref Chem., Pasadena, TX, 09/86 to
09/91 Electrical Helper Amoco Chemicals, Industrial Chemical Plant, Texas City,
TX Recommended
and implemented new switching center design, which resulted in improved
equipment maintenance and switching operations.
|
|||||||||||||||||||
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|